After six months of design, production, and assembly, we got a robot that does In-Mold Label, take out of two products from two different IMM (injection machines), assemble the two products, vision check, and stacking. Now it is on track to New Zealand. Due to the COV limitation, we will do the installation remotely for the first time.

Related posts you might be interested in
- February 25, 2021
Purim 2021